              June 2025 topanga canyon slope reconstruction
 
              
              
              05-25 oil pipeline repair in nature preserve
 
              
              
              05-2025 Right of way utility mulching menzi muck m545x
 
              
              
              04-2025 oil pipeline repair
 
              
              
              04-2025 oil pipeline repair
 
              
              
              03 25 right of way mulching for oil pipeline repair
 
              
              
              February 2025 oil pipeline repair Menzi muck m545x
 
              
              
              Menzi Muck m545X January 2025 oil pipeline repair
 
              
              
              December 2024 Oil pipeline repair.
 
              
              
              November 2024 oil pipeline dig shoring box removal, and line cut out and restoration.
 
              
              
              September-October 2024 oil pipeline repair
 
              
              
              July- August 2024 oil pipeline repair
 
              
              
              Sedona arizona June-July slide repair and down drain install
 
              
              
              May 2024 Topanga canyon slide
 
              
              
              May 2024 Catalina CA
 
              
              
               
              
              
              March 2024 swing bearing bolt replacement. Not much we can’t fix.
 
              
              
              March 2024 maintenance swing bearing bolt replacment
 
              
              
              March 2024 river cleanout
 
              
              
              January 2024 San Jose creek
Debri removal, and cleanup in San Jose creek drainage.
 
              
              
              January 2024 Sedona Arizona
Bench construing after blasting.
 
              
              
              December 2023 River Cleanout
 
              
              
              December 2023 Monrovia CA
Slope cleanup after slide
 
              
              
              November 2023 finishing slope construction for Arizona drilling and blasting and caltrans.
 
              
              
              October 2023 wildlife curious what I am doing in their back yard.
 
              
              
              October 2023 slope construction for Arizona drilling and blasting and caltrans.
 
              
              
              October 2023 finishing holighway 2 for Arizona Drilling and Blasting and Caltrans
 
              
              
              Audit 2023 Corta Madera CA
Slope cleanup
 
              
              
              May 2023 Caltrains slide removal Highway 2 for Arizona drilling and blasting.
 
              
              
              April 2023 finishing footing excavation for point sur light house
 
              
              
              April 2023 footing excavation for point sur light house.
 
              
              
              2023 February Water tank excavation.
 
              
              
              2023 January hillside excavation Hollywood hills
 
              
              
              2022 December digging footings Bel Aire CA
 
              
              
              2022 December drilling Hollywood
 
              
              
              2022 November footing excavation for new water tank
 
              
              
              2022 October slope cleanup
 
              
              
              2022 September pipe line backfill
 
              
              
              2022 June -july Drilling Hollywood Ca
 
              
              
              Caisson drilling Hollywood May 2022
24”x 35ft caisson holes
 
              
              
              April 2022 drilling for office structure 24”x 15ft
 
              
              
              April 2022 drilling Hollywood Hills. Drilling 24”x 35’ holes.
Getting into any position to drill.
 
              
              
              March 2022 excavation prep for Caissons. 24”x35ft deep Caissons.
 
              
              
              February 2022 avocado orchard preparation
 
              
              
              42” simi valley february 2022 Caisson drilling to 35 ft in sandstone new innovative drilling bars.
 
              
              
              December 2021 water flow diversion vegetation clean up
 
              
              
              December 2021 River clean out
 
              
              
              November 2021-current River clean out
 
              
              
              October 2021 Bel Canyon
Moving the spider to access the drill location for the 30 ft caissons
 
              
              
              August -September 2021
30 ft caissons Santana CA
 
              
              
              July 2021 Hollywood Hills
500 ft of compacted road created with Spider for drill Rigs and other equipment.
 
              
              
              June 2021 Hollywood Hills CA
Creating drill rig access
 
              
              
              April 2021 Hollywood CA Equipment Access Creation For Custom Homes
 
              
              
              April 2021 Franklin lot Pre Construction Access
 
              
              
              March 2021 Sunset Plaza Right of way for Drilling Equipment
 
              
              
              March 2021 Cleaning up for survey Los Angeles
 
              
              
              March 2021 back to Hollywood
 
              
              
              February2021 Placerville Finish drilling after the rain
 
              
              
              January 2021 Somerset Ca
Waterline and electrical drop for pump house.
 
              
              
              January 2021 Somerset CA (Placerville area)
Water line and electrical line installation.
 
              
              
              December 2020 Eastman Lake CA
V-Ditch Construction
 
              
              
              November 2020 Yosemite National Park
Scaling Operation for Blasting Slip
 
              
              
              November 2020 Hollywood Hills
Equipment access Construction
 
              
              
              September 2020 Hollywood Hills
Temporary equipment access
 
              
              
              Kansas City Missouri July- August 2020
Slide Repair, and removal for Apex Rockfall,KCT, and BNSF on 53 degree slope
 
              
              
              Bel Aire 2020 June-July
Digging for trees, Demolition of Storm drain and replacement of culvert.
 
              
              
              May 2020 Hollywood Hills
Riley Bowers my friend, and my first student learning how to run a spider really well.
 
              
              
              May 2020 Pine Flats Dam Sanger CA
Compliments to James Wheeler with Apex Rockfall for the great picture taking.
 
              
              
              April 2020 Hollywood Hills CA
 
              
              
              March 2020 Hollywood Hills
 
              
              
              February 2020 Hollywood Hills
 
              
              
              January 2020 Hollywood Hills Los Angeles
Creating access for Home developers.
 
              
              
              Nov 2019 Woodland Hills CA
Cutting and grading basement for multi level footings.
 
              
              
              Sausalito CA October 2019 Demolition from Landslide
September 2019 Hollywood Hills
Drill Rig Access
 
              
              
              August 2019 Hollywood Hills Slope and bench cut.
August 2019 Moorpark CA Fire Fuel Reduction Services
Linda Flora Storm Drain Project July 2019 For the City of Los Angeles
hollywood CA july 2019 Construction Access in limited space.
 
              
              
              Neighborhood fire fuel Reduction June 2019
Moorpark California May-June 2019 4,400 citrus trees.
Selective mulching between Citrus trees, Avocadostrees, and Live utilities.
Specific use of tilt rotator, and mulcher.
 
              
              
              San Juan Creek DemolitionMay 2019
working our 2250lb breaker with innovative foot design. Innovation keeps us ahead of the rest. Necessity is the mother of Invention

March 2019 Emergency Slide Removal Angeles Crest Hwy2
Emergency Slide Work Feb 2019 Los Angeles CA
Feb 2019 Hollywood Hills
Cutting 50 degree slopes cabled off on decomposed granite.
Hollywood CA January 2019 Slope Grading of 1.1
Hollywood CA December 2018 Slope Grading DG
just got Done Moving the machine into position.
Caisson Drilling Anaheim Hills Dec 2018
24” & 36” Caissons 16ft deep
November 2018 Oil Pipeline Repair
Pacific Palisades Demolition Novemeber 2018
Hillside home demolition Pacific Palisades October 2018
Drilling 40” x 18ft deep holes in Hollywood Ca October 2018
Santa Susanna Retaining Rock Wall October 2018
Caisson Drilling Bel Aire September 2018
Fireline Rehab Holy Fire August-September 2018
Offset Digging with the Engcon Tilt Rotator
August Bel Aire CA Footing Excavation 2018
Bel Aire August 2018 footing reinforcement for home addition.
Debri Cleanup Slope July 2018
Footing Spoil Removal under House July 2018 Bel Aire CA
Catch Basin clean out in Canyon Bel Aire Jun 2018
Small Rock Wall construction Bel Aire June 2018
 
              
              
              Steep Terrain Demonstration in the Menzi Muck M220 in Placerville Ca. June 2018
Hollywood CA City of Los Angeles Emergency Storm Drain Repair
May 2018
Brush Clearing Fire fuel Reduction Bel Aire CA April 2018
Weed Abatement slope cleanup For a Bel Aire Client April 2018
Setting Cages for the Caissons In Bel Aire April 2018
Bel Aire Ca April 2018
Technical Drilling inches away from the house through live utilities without any problems.
Bel Aire March 2018 Slope Terracing
San Juan Capistrano March 2018 Brush Clearing
Slope Restoration with Tree Installation 2018
Land Slide Slope Replacement Southern California 2018
Brush Clearing/ Tree Removal 2018
 
              
              
              Dam Removal San Juan Creek
 
              
              
              Dam Removal San Juan Creek 2018
2018 Land Slide Slope Reclamation Project Current For La City Engineering.
2018 Land Slide Slope Reclamation Project Current For La City Engineering.
2017 Utility Trenches Bel Aire CA
2017 Caissons For Hillside Reclamation for Patio
2017 Storm Drain Replacement Old Rd. Santa Clarita for Cal Trans
2017 Solar Panel Caissons Hard To Reach Areas.
2018 Project of The Year Award For Palomares Road Landslide Repair
Joint Effort With Mocon Rockfall and Walker Martin 1-760-485-7290
2017 Incline Village Tahoe Electrical Trenching
Palomares Road Landslide Repair June 2017
2017 Drilling Anchors for an Active Slide Bay Area
2017 Rockfall Mitigation Fremont California Flying in The Excavator for Alameda County CA

2017 April- September Solar Panel Caisson Drilling For Solar Panel Farm.
2017 Contaminated Cleanup of Gun Range US Navy.
 
              
              
              2016 San Diego Drainage Pipeline Repair
 
              
              
              On the move over seas 2016
2016 Debris Cleanup Oahu Hawaii for NCTAM Navel Base.
2014 Slope Grading Topanga and PCH Malibu Ca
2013 Fort Tejon Oil pipeline Inspection
 
              
              
              2015 Hillside Demolition
2014-2015 Slope Erosion Re compaction So Cal Gas Company Playa Vista CA.
 
              
              
              2013 Drainage Ditches Interstate 580 Liver More CA for Cal Trans.
 
              
              
              2013 Patio Caissons and Rock placement
 
              
              
              2012-2013 Carlsbad Caverns New Mexico. Water line Replacement for National Park Service.
 
              
              
              2014 San Clemente Dam Removal Carmel Valley
 
              
              
              Caisson Drilling for Clear Channel 2013
 
              
              
              2012 Drilling Caissons Clear Channel Radio Los Angeles CA.
2012 Room Addition Caisson Drilling
 
              
              
              2011 Patio Decking Caissons Drilling Caissons
 
              
              
              2011 Mulching for Avocado Trees
2011 Ventura Harbor Rip Rap Construction Wall for California Coastal Commission.
2011 Camp Pendleton CA Gun Range Construction for the Military.
 
              
              
              Brush Mastication Simi Valley 2011
 
              
              
              Utility Trenches Griffith Park 2011
2010 Incline Village Stream Restoration Lake Tahoe.
2010 Route 101 Slope Grading for Cal Trans Hollywood CA.
2010-2011 LaCanada Flintridge Spillway, and drainage Construction for Cal Trans.
2010 I 405 Widening Project Tree Removal for Cal Trans
2010 Diamond Bar California Caisson Drilling
2009 Hollywood Hills Retaining Wall For Los Angeles City Engineering.
 
              
              
              Utility Trench 2009 Simi Valley
 
              
              
              Site Clearing for Drilling Caissons Diamond Bar 2010
 
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
      